The Central Intelligence Agency and Overhead Reconnaissance; The U-2 and OXCART Programs, 1954-1974
CIA-UAP-003 · page 252 of 406
Text
This text came with the file. It may have mistakes. When the text and the image disagree, the image is right.
239 ~eeret NOFORN Chapter 5 The FFD-2 unit was installed in a U-2C[ Nn mnre U-2 fli2:hts over Lnma usea tne mrrareo I scannerj The loss of yet another U-2 and its pilot made Nationalist Chinese officials reluctant to resume overflights of the mainland. They insisted that their U-2 pilots be given permission to turn on the System-XIII false-angle device during the entire time they were over hostile territory, not just after they had been alerted by the System-XII radar-detection device. The Defense Department acceded to these de mands in order to keep the TACKLE flights going. In addition, the Project TACKLE U-2s began receiving even more advanced ECM • 60 equipment. •• Mission folders C284C (22 November 1964), C304C (25 November 1964), C344C (19 December 1964), and C0l5C (8 January 1965), OSA records, job 66-B-664, box 8, job 69-B-404, bait 2, and job 66-8-597, bait I; USIB History, vol. 6, p. 758 (TS Codeword). "' Ibid.. chap. 17, pp. 59-61 (TS Codeword). Seoret