ww o . ..2.::pages, copy /
-
~
V
I
.
# , series__
..;
7 April 194.9
•
SUBJECTs
Security Inspection
g. Pressure has been exerted to get the Post 'Ehgineers to
keep the dra.inage system. clear and to take measures to check the ero­
sion. These efforts will be continued but lit tle progress on erosion
control can be expected until the rains diminish.
Ditches have been
filled, dirt moved and replaced, native gras ses planted, but the rains
return too soon and much of the effort invested is therefore wasted.
Plans a.re prepared f or an interim erosin control effort, and a stud;y
is being ma.de to estinate the cost of resloping the cuts in order
that the rainfall mq be drained with less damaging results. Initial
estimates run in the neighborhood of twenty thousand dollars (t20,ooo.oo).
3. With the exception of halting the erosixm, all deficiencies
listed in the security inspection report have been cleared away. It
is therefore requested that the monthly report of action taken re­
quired by cited letter be discontinued.
/(~4/./?L_
RICHARD TI' KLIN.!!i
Lt Col, USAF
Commanding
NND 58378