AAWSAP DIRD, Aneutronic Fusion Propulsion II, November 2010
DOW-UAP-D146 · page 34 of 36
Text
This text came with the file. It may have mistakes. When the text and the image disagree, the image is right.
UNCLASSIFIED// FOR OFFICIAL d.!H! 9HLY PHYSICS DEMO Tech Development Grpund DEMO FU 0 MANNED MISSION 2000 2010 2020 2030 2040 2050 2060 Figure 20. Roadmap to Aneutronic Fusion Propulsion Development Design trades and evaluation can then ensue with confinement vessel design (including fuel supply and introduction), basic exhaust control modeling for regulation and maximum efficiency, crew and equipment safety concepts, effective launch and deployment concepts, and complete end-to-end power train and energy recovery concept implementation. Ground demonstrations have been conducted during all of the previous phases, but a complete end-to-end demonstration of the working concept is necessary before deployment. This demonstration is the culmination of the design physics and engineering models with a complete simulation from launch, execution, and return to Earth. The estimated date for a manned mission is contingent upon the successful execution of the prior technology phases and again, success depends upon thorough execution, complete analysis, proven concepts, engineering models, and significant and careful investment strategies. UNCLASSIFIED//fOll orr1e1J1tt U.!l!! er•t I 29