Preliminary Gemini 4 Crew Debriefing, Part II, 1965

NASA-UAP-D017 · page 120 of 290

Page 120 of 290 of NASA-UAP-D017

Text

This text came with the file. It may have mistakes. When the text and the image disagree, the image is right.

114
McDivitt
White
McDivitt
McDivitt
White
McDivitt
We got every checklist that was required to make
the spacecraft run on these two sets of cards,
which together were about 3/4 of an i nch thick.
I feel that we had a real workabl e solution to
the problem.
These things were the same size as
those carried on GT- 3.
They were much more ex­
panded than what GT- 3 •had.
We had the whole
how-to-operate the spacecraft routine on these
cards.
The preparation and availability of them-- is
this from a training standpoint .
That i s later
in the brief.
Well , anyway, we actually received our cards at
about 8:00 the night before the launch.
That ' s the thing that I was hollering about the
loudest not to have happen and it happened.
understand why it happened, but-­
We had so many changes in the flight plan and
nobody was working on turning this stuff out .
Our time was so filled with over-all t raining
and the change in flight plan that we just didn ' t
have time to go--, We did not have time to go
through the checklist over and over.
When we did