Preliminary Gemini 4 Crew Debriefing, Part II, 1965
NASA-UAP-D017 · page 186 of 290
Text
This text came with the file. It may have mistakes. When the text and the image disagree, the image is right.
178 the sun. The scanner broke lock. We started pulsing down for two or three pulses, then stopped , but the scanner ignore light stayed on longer than 7 seconds and then it went out . We pulsed up one or two times to start recovering from these initial two or three pulses that started us down , and then the l i ght came on again. It was only off for about 2 or 3 seconds, just a very short time. We were at about 30 degrees pitch down at this time. We then started pulsing pit ch-down rapidly with the scanner ignore light on. We pitched down and did a 360-degree maneuver in pitch; we started just about horizontal, pitched down till we were looking at the ground , continued pitching down with respect to the spacecraft until we were horizontal, upside down, now faceing the opposite direction than we 'd started, and continued pitching down with r espect to the spacecraft. The small end ended up straight up and we continued pitching down again until we started coming back back down to the horizon. did not at any time during this maneuver attempt to control the spacecraft. The pitch- down I