Preliminary Gemini 4 Crew Debriefing, Part II, 1965
NASA-UAP-D017 · page 248 of 290
Text
This text came with the file. It may have mistakes. When the text and the image disagree, the image is right.
240 McDivitt White McDivitt White 12.4 Mission Rules White McDivitt White were going to get these final changes in that were required for our flight. They sure waited a long time to put them in. Yes, two or three days before the flight we still had a lot of things missing. In fact, when I got into the spacecraft, about the first thing I noticed was that the velcro wasn't around the 8-ball. About 30 minutes later, while we were lying there waiting for the launch, El looked up and pointed at the 8-ball at the place where the velcro was not. Yes, there wasn't velcro in several places where I had wanted it, and in several places where I had actually drawn in the lines where I wanted them to put the strips. Inst~ad, they put them 90 degrees to where I had the lines . I can' t believe they would do something like that. I'm not really complaining. I think they did a pretty ,good job. Do you have anything else on spacecraft chan.ges? No. I thought this was one of the smoother points. What? Mission rules? Mission rules.