Preliminary Gemini 4 Crew Debriefing, Part II, 1965
NASA-UAP-D017 · page 265 of 290
Text
This text came with the file. It may have mistakes. When the text and the image disagree, the image is right.
257 . COt'4FIDE~~TIAL When it arrived down at the Cape, it was com pletely inadequate for the job, and I can' t understand why that program wasn ' t checked out in better shape when it went down there.. White I think, also, they're caught as second-rate ci tizens as far as keeping their simulators up to date and getting the latest spacecraft changes in them. They seem to be way behind t he space craft and indicated to me that the system did not permit them to update the simulator wit h t he speed with which it ought to be updated to t rain the crews properly. The things that were characteristic of Gemini 4 were being incor porated in the simulator down there in the last two or t hree weeks when they should have been incorporated in the first two or three weeks after the changeover from GT-3 to GT-4 , I think we just have to work on a faster processing of the changes in getting the pieces of equipment and the changes out to the simulator so that they can be incorporated in it. Once they got the changes down there, they got them incorpor ated into the simulator, seemed like, pretty -COIS~FIOEI\ITIAL