John Company

Preliminary Gemini 4 Crew Debriefing, Part II, 1965

NASA-UAP-D017 · page 274 of 290

Page 274 of 290 of NASA-UAP-D017

Text

This text came with the file. It may have mistakes. When the text and the image disagree, the image is right.

266
actually got up close to the window, when we
wer e up flying, I could see more stars , as I
thought I could.
I thought that the training
we received was good.
McDivitt
Yes .
No doubt about it,that was all time well
spent.
14.6 Systems Br iefings
McDivitt
Syst ems Briefings ,
We actually had briefings on
every system in the spacecraft , and there are
quite a number of them.
The schedule was such
that we had a general briefing here at Manned
Spacecraft Center on each and every one of these
systems .
I think we had a second briefing here
at the Manned Spacecraft Center on certain
systems like the ECS before we went to the
altitude chamber.
We had a number of briefings
on the systems again up at McDonnell by
McDonnell engineers in St, Loui s.
We went dovm
to the Cape, we had another general briefing by
the McDonnell engineers at the Cape probably six
weeks before the flight , and then about ten days
before the flight we had a final systems
briefing where they just discussed any changes
~
El~
.