Preliminary Gemini 4 Crew Debriefing, Part II, 1965
NASA-UAP-D017 · page 276 of 290
Text
This text came with the file. It may have mistakes. When the text and the image disagree, the image is right.
268 I and we did indeed go make a couple of dry runs and a couple of wet runs on the x-ray table to make sure that we could get it done quickly. think this paid off. We never had any delay due to these x-rays . We certainly all knew how to use the exerciser. And the phonocardiogram needed no practice. S- 5 and S-6 did not r equir e any training here on the ground , because these were supposed to be photographs from orbit. That thing was impossible to simulate on the ground. The D-8 required no simulation, so it boiled down to D-6, D-1, and D-9 as the exper i ments that required simulation prior to flight. As we said earlier, we felt that the. Translation and Docking Trainer and the Martin Denver simu lation for the D- 6 experimentwAre very valuabl e. ·They gave us the techniques that we needed to perform this thing in space. Gemini Mission Simulator was invaluable, too, for everything- for experiments , operational checks and for the whole mission. White As far as any really D-9 work, though, with the simulator, all we could go t hrough wer e kind of