John Company

Preliminary Gemini 4 Crew Debriefing, Part II, 1965

NASA-UAP-D017 · page 57 of 290

Page 57 of 290 of NASA-UAP-D017

Text

This text came with the file. It may have mistakes. When the text and the image disagree, the image is right.

51
McDivitt
White
McDivitt
White
That ' s right .
The way that the thing was set
up , we could sure monitor it because we knew
it was going to vent without being on the
gage .
I think they compromised the whole
system so we could monitor it .
As a matter of fact, we monitored it very
thoroughly and spent about 100 times as much
time on t his SJstem as we should have.
John
Young ' s been complaining about this point,
and I think that it ' s a very poor thing.
They
ought to dig up the money and put a gage in
there that will do the job .
Very strong
point .
The quantity measuring system,I thought,
was all right.
I thought it was pretty good .
I thought it
was excellent as a matter of fact . It was a
very readable gage ,. It had tremendous scal e
on it, but, shoot, you could read the thing to
a percent .
I don't know why it was a:ny more
readable than the other ones, but I thought it
was pretty good.
The flow rates--I don't have a:ny particular
comment on that .
I thought the flow rate on
N4sl-f.1Dfl~T1Aw