Preliminary Gemini 4 Crew Debriefing, Part II, 1965
NASA-UAP-D017 · page 92 of 290
Text
This text came with the file. It may have mistakes. When the text and the image disagree, the image is right.
86 McDivitt White McDivitt and near the end of the mission, we were down to 12 or 13 amp-hours on unpowered down configuration. That was as low as I saw it go, down around 12 . Another thing that we did was that when we weren't actually planning on transmitting on one of the radios, we were always putting the mode control switch to INTERCOM, which would then cut the trans mitter off the line. You could actually see the ammeter go down a little bit. So I think that by really powering down the spacecraft and getting all the non-essential items off the line, we helped ourselves a lot. We got this 160 amp-hour cushion because we really worked at it, not because it just happened like that. This takes a little diligence. Yes , not because it was a miscalculation on the guys who were planning the flight, but just the fact that we really worked at keeping the lights off, keeping the radios off, and keeping those little bitty things down. You know, you only have to save two amps per hour. We ran on a single suit fan almost the entire flight, except when Ed was getting warm when he was sleeping we had to