John Company

Preliminary Gemini 4 Crew Debriefing, Part II, 1965

NASA-UAP-D017 · page 99 of 290

Page 99 of 290 of NASA-UAP-D017

Text

This text came with the file. It may have mistakes. When the text and the image disagree, the image is right.

93
8.8 Crew Station
McDivitt
White
McDivitt
Controls and displays-
. -okay, I' 11 talk about
that. The s,equential Telelights all operated
properly,--came on in the proper colors,
and
punched off and everythi.ng. The event timer
operated properly. The IVI operated properly.
The flight director indicator operated properly.
I would like to discuss the GLV fuel and oxidizer
pressure gages here for a minute .
We got about
a $25 million vehicle,! think,that depends almost
entirely on a launch. We've got an onboard
manual ietection system ,or something like that .
Malfunction detection system.
Malfunction detection system.
An integral part
of the malfunction detection system, are the fuel
and oxidizer pressure gages for both the first and
second stages . This is one of the abort criteria
I
On the scal e of these gages down below the glass
is a beautiful, beantiful set of lines and numbers
and hash marks ,tha.t are wrong. They updated the GLV
information and found out that these things were
in error by quite a bit. No~ to take and fix
these gages would have taken a couple thousand
bucks.
I don't know exactly how much or how