Gemini 4 Experiment Debriefing, 1967
NASA-UAP-D018 · page 7 of 224
Text
This text came with the file. It may have mistakes. When the text and the image disagree, the image is right.
M-913-65-04 a. Leakage b. Proof pressure c. 02 compatibility d. Ejection envelope e. Cold temperature f. Rapid decompression g. Life cycling h. Visor testing Should the 25-foot long tether fail in some manner, the pilot will be carrying a chestpack that has been compatibility qualified with the G4C suit and con sists principally of an emergency oxygen bottle with automatic valving. It should be emphasized that both the primary and backup flight crews have undergone 40 minutes cabin depressurization with the hatches open at a simulated altitude of 150,000 feet in the chambers at McDonnell, St. Louis during which time they practiced opening and closing the hatches, taking pictures, and other actions that will take place during EVA. The extravehicular maneuvering will be accomplished using a zero g Integral Propulsion (ZIP) Unit as shown in Figure 5. This device is handheld and accomplishes propulsion by jetting oxygen out through a single forward firing nozzle and two aft firing nozzles as selected and aimed by the operator. It includes a camera mounted for convenient extravehicular photography. FIG. 5 6/1/65 Page 5