John Company

Gemini 5 Technical Debriefing, Part II, 1965

NASA-UAP-D020 · page 201 of 325

Page 201 of 325 of NASA-UAP-D020

Text

This text came with the file. It may have mistakes. When the text and the image disagree, the image is right.

190
than I needed.
I had to be very careful to just
put a little teensy tweak in to damp the rates.
Later on, as we got on down, maybe half way
through the g pulse area, the rates began to in­
crease in amplitude and in frequency.
J still
was able to handle them very adequately.
No
problem at all on tweaking the rates out on
pitch and yaw.
However, at about this I1eriod
of time, it began to take so much time t o switch
back and forth from rate to attitude and get the
rates damp that I was getting concerned about the
math flow guidance in here and making sure I
stayed on it. At this point then, probably half
way through or somewhere on down through the
l atter part of the reentry, I just switched over
to the ACME position and allowed the RCS rate
command t o damp the rates .
Then, I wouli reach
over and check the rat es once in a while to see
how it was damping. But, then, I could concentrate
on purely attitude .and just fly this same single­
ring attitude control. It left me plent,v of
attitude control .
Never once when I cheJked the
rates were the rate needles ever off zer). It