Gemini 5 Technical Debriefing, Part II, 1965
NASA-UAP-D020 · page 201 of 325
Text
This text came with the file. It may have mistakes. When the text and the image disagree, the image is right.
190 than I needed. I had to be very careful to just put a little teensy tweak in to damp the rates. Later on, as we got on down, maybe half way through the g pulse area, the rates began to in crease in amplitude and in frequency. J still was able to handle them very adequately. No problem at all on tweaking the rates out on pitch and yaw. However, at about this I1eriod of time, it began to take so much time t o switch back and forth from rate to attitude and get the rates damp that I was getting concerned about the math flow guidance in here and making sure I stayed on it. At this point then, probably half way through or somewhere on down through the l atter part of the reentry, I just switched over to the ACME position and allowed the RCS rate command t o damp the rates . Then, I wouli reach over and check the rat es once in a while to see how it was damping. But, then, I could concentrate on purely attitude .and just fly this same single ring attitude control. It left me plent,v of attitude control . Never once when I cheJked the rates were the rate needles ever off zer). It