Gemini 5 Technical Debriefing, Part II, 1965
NASA-UAP-D020 · page 21 of 325
Text
This text came with the file. It may have mistakes. When the text and the image disagree, the image is right.
16 Cooper Conrad Cooper Conrad Cooper 8. 2 OAMS Cooper Cooper •i Q:Mf~Cf1stIIAla .. Platform controls were very straight fc,rward. I thought they all functioned as expected. The Platform took the full 25 minutes to go through the fast heat, and the first time on it was really cold and took another 3 minutes worth before start of the Cage Cycle. After that, it seemed to stick right around 25 minutes to get the platform up and on the line and start into Cage. Right now, I've got extreme confidence in that Platform. I really think it does well. '.Ihe platform did an outstanding job during the entire flight. I t sure did. We fired the OAMS on the pad and it was mushy. You couldn't hear them fire just gas mainly, About the third round of firings however, you could really feel them fire off, they were all good. During flight the OAMS started out very good and in about the third day began to degrade. ~:he f i fth day