Gemini 5 Technical Debriefing, Part II, 1965
NASA-UAP-D020 · page 224 of 325
Text
This text came with the file. It may have mistakes. When the text and the image disagree, the image is right.
213 FCSD REP Conrad Why don ' t we wait? We did that portion of D- 1 that was.. . . Then the next D- 1 we did was Mode 2. This was done on Venus at 02 days 13 hours 00 minutes. We took 4 pictures of Venus at l / 30th of a second on magazine 11 which was the 8443 IR Film. It was taken through the Questar lens visually with reticle tracking. Let me check the book to see if that is all. D- 1 , Mode 2 we did at 02 days 13 hours 20 minutes, on Alpha Centauri using magazine 9 which was 3401 Film. We used the Questar lens , took 4 pictures and that completed the D-1 Experiments. Let ' s run through the updating techniques and communications procedures that ar e used with the other experiments and I ' ll only cover them once and that' s this time . We send up the title of the experiment , the GMT of the experiment , the sequence number if required , a Mode number if required and then any other require ments went in the remarks section. Things such as pitch, yaw, up , down, filmspeeds, and delta times or anything else went in remarks. I think that this procedure worked extremely well . Ther e was never any confusion on our part as to what Gelat,JOENltAt