Gemini 5 Technical Debriefing, Part II, 1965
NASA-UAP-D020 · page 266 of 325
Text
This text came with the file. It may have mistakes. When the text and the image disagree, the image is right.
255 12.0 PREMISSION PLANNING 12.1 Mi ssion Plan (trajectory) Cooper On these l onger flights you have to be prepared for more real - time mission pl anning, which we were. And we had planned on this perhaps being the case and we hel d al l the flexibility that we could in our pl anning. You need to get all of the key things that you're going to do planned and trained for as well as possible, but the way you fit them together has to be flexible . This applies more to the flight pl an than it does to the over- all mission plan. 12. 2 Flight Plan Cooper Flight plan almost invariably winds up being l argely real-time planning. 12.3 Spacecraft Changes Cooper Spacecraft changes has al ways been a sore point with me and stil l is . I can ' t emphasize enough to give the crew and everybody el se a fair shake by hol ding spacecraft changes to a real firm, hard freeze date. No more changes should be made after a certain date because it adds hardship to everybody invol ved, and does not allow the crew time to train. Some changes are going to be necessary because of what you find out on the preceding flight, but I think they should Jl