John Company

Gemini 5 Technical Debriefing, Part II, 1965

NASA-UAP-D020 · page 281 of 325

Page 281 of 325 of NASA-UAP-D020

Text

This text came with the file. It may have mistakes. When the text and the image disagree, the image is right.

270
14,0 TRAINING
14.1 Gemini Simulator Procedures
Cooper
The procedures that we went through in-·it- and our
t raining was pretty accurate.
I think that we used
the right procedures in the development of our
checklist.
In going through the procedures we
should have ""tad; our flight type checkli~;t at an
earlier date in order to get a little bii.
more famili ar with them and to iron them out a little
more in the GMS.
We should have had them j or 4 weeks earlier.
System knowledge--I didn' t feel we were t oo bad off
system knowledge wise, did you?
Conrad
No .
Cooper
We were pretty well on top of everything,
We had
a great deal of confidence in knowing the systems.
The systems training that we got in the GMS on the
fail ure analysis along with the lectures we got
by t he systems people , both the GMS people and the
McDonnell people , put us in pretty good s·1ape
syst em wise.
We were in excellent shape ,:::oncerning
launch t raining.
I might say that i f the::-e is any
changing to be done we should emphasize the nominal
launch more.
We ran through al l types of emergencies.
We had some good sessions on the DCPS.
We had some
eot-~FIDE~~T1At