Gemini 5 Technical Debriefing, Part II, 1965
NASA-UAP-D020 · page 317 of 325
Text
This text came with the file. It may have mistakes. When the text and the image disagree, the image is right.
306 watch here I kept on G.m. t . 15.5 Miscellaneous Discrepancies Cooper FCSD Rep Cooper OK , I have a little list of discrepanc:.es -ti~ that I might just include here. These are discrepancies that I noted during the flight and somn of them have been noted bef ore, but I might juHt hit them real briefly. Just to make sure we have all of them. 1. We lost the stage 2 IPS fuel gage shortly after launch. 2. We encountered this POGO effect at 2 minutes and 6 seconds. 3. We lost communications near SECO on UHF No . 1. many of these have already been explained why, but I just--1 111 get these down. 4. We lC>st fuel cell o2 tank heaters. 5. The M..:1 experimer..t pooped out and also I thought it was objectionably noisy. 6. The gray interior paint flecks off of the guard bars and off several areas of the cockpit areas and • floats and flecks around on the inside. 7. The platform mode was no good for t he burm, and was not holding the spacecraft as it should. Let me ask one question. Did you ever try that platform control mode on the RCS system? No , I didn't. Sure didn't. I wish I l:.ad, I just- I guess I had just given it up at that point and just didn I t get around to it . I should. have. The