Gemini 5 Technical Debriefing, Part II, 1965
NASA-UAP-D020 · page 52 of 325
Text
This text came with the file. It may have mistakes. When the text and the image disagree, the image is right.
47 FCSD rep Conrad Cooper 8 .3 RCS FCSD rep Cooper Conrad Cooper FCSD rep Cooper FCSD rep Conrad Cooper Cooper COt~FIDE~~TIAt OK- well, I don't think there is much we can add then--did you get all of these readings out of- 8O-81- 82- 58- 59- 69- Yeah, that stuff works just like the simulator. We got the readings . OK - On to 8.3 - RCS. Let's go into the RCS - yeah, I don ' t think there is anything more- This is all- Yeah, this is all we can do on the REP. OK- RCS Operational Checks - We did just like we had planned in our little book. We activated the RCS and Check Ring A and ACME and direct--al l three axis- Ring B - Check Ring Bin ACME and direct--all three axis and they worked beautifully. How about the pad checks--were they- Negative No pad checks? Not with the sealed system- A sealed system - I'm glad it was- Control Modes - We used pulse and we used horizon scan- tQEt◄Ttl<L