John Company

Gemini 5 Technical Debriefing, Part II, 1965

NASA-UAP-D020 · page 52 of 325

Page 52 of 325 of NASA-UAP-D020

Text

This text came with the file. It may have mistakes. When the text and the image disagree, the image is right.

47
FCSD rep
Conrad
Cooper
8 .3 RCS
FCSD rep
Cooper
Conrad
Cooper
FCSD rep
Cooper
FCSD rep
Conrad
Cooper
Cooper
COt~FIDE~~TIAt
OK- well, I don't think there is much we can
add then--did you get all of these readings
out of-­
8O-81- 82- 58- 59- 69- Yeah, that stuff works
just like the simulator.
We got the readings .
OK - On to 8.3 - RCS.
Let's go into the RCS - yeah, I don ' t think
there is anything more-­
This is all-­
Yeah, this is all we can do on the REP.
OK- RCS Operational Checks - We did just like
we had planned in our little book.
We
activated the RCS and Check Ring A and ACME
and direct--al l three axis- Ring B - Check
Ring Bin ACME and direct--all three axis
and they worked beautifully.
How about the pad checks--were they-­
Negative
No pad checks?
Not with the sealed system-­
A sealed system - I'm glad it was-­
Control Modes - We used pulse and we used
horizon scan-­
tQEt◄Ttl<L