John Company

Gemini 5 Technical Debriefing, Part II, 1965

NASA-UAP-D020 · page 56 of 325

Page 56 of 325 of NASA-UAP-D020

Text

This text came with the file. It may have mistakes. When the text and the image disagree, the image is right.

51
COt-ct FID Et'<ITI AL
jiggle--single ring was holding i t just as
tight as could be.
Retrofire attitude
..
control - I had already mentioned on there­
dual ring. Rate Command, reentry attitude
control-- I had already mentioned how we
shot the reentry.
No primary heater lights.
Heater lights on the RCS - they were on
practically--we had the heater on 99 percent
of the whole flight.
We turned it off, got
heater lights on Ring A first, brought the
RCS heaters on then rechecked-heater light
went off and turned the heater off and about
five or ten minutes later-fifteen minutes
later, the heater light came on and then it
was on Ring Band we turned the heater back
on and this went on five or six times and
finally we just turned the heater on and
left it on the whole flight.
I monitored
the temper~tures f~equently throughout the
whole flight in the RCS Ring A - temperature
ran about 70 degrees or about 65 degrees
and the RCS Ring B temperature ran about
70 to 72 degrees the entire flight .
At
<::.:.€0►~FIDE~~T IA L