Gemini 5 Technical Debriefing, Part II, 1965
NASA-UAP-D020 · page 90 of 325
Text
This text came with the file. It may have mistakes. When the text and the image disagree, the image is right.
85 c€~F,6Ef~ fI Cooper FCSD REP Conrad Cooper Conrad Cooper awhile and it finally ran itself out and stopped. But it looked l ike the accelerometer bi as took off or did something that just made IVI 's run. I don't really understand what happened but I wanted to note that an anomaly. I felt that the thing was running right and that this might have been a little glitch so I didn't report it to ground because, well, later on we didn ' t really have any need for catch up or anything like t hat and it seemed to operat~ okay. Okay , let's see. Orbit maneuvers. I don't think there was How about the powering down and powering up? It shut down and started up d~t as advertised. ON with the on switch and 18 seconds it went through it's self check and the green start comp l i ght ca.me on green and it did it every time. Okey, Orbit maneuvers we have already covered that. We powered it up for all our updates and it accepted it every time, llO strain·. Retro fire, you got those numbers through, We gave the number to .. . . IVI's after retro fire. Read 269 aft and 10 left and 181 down.