John Company

Gemini 5 Technical Debriefing, Part II, 1965

NASA-UAP-D020 · page 95 of 325

Page 95 of 325 of NASA-UAP-D020

Text

This text came with the file. It may have mistakes. When the text and the image disagree, the image is right.

90
8.8 Crew Station
Cooper
Conrad
Cooper
Conrad
Cooper
Conrad
Cooper
Conrad
Okay, control s and displays, sequence telelights .
The only comment I have on sequence t el elights is
that the comp light on the comput~r is too bright.
That 's right.
We are going to have to have some way of iimming
that or put some tape over it or something, because
That 's a comment for GT-6 especially.
Because when you are running it at night with the
computer on for rendezvous, that comp light darn
near blinds you.
Yeah, it I s really bright .
That needs a dim f eature
on i t.
The other sequential telelights that are in there
are all dimable, or turnoffable .
Say, there is one thing t hat we didn't t r y through.
I wonder if that thing is on the bright-dim sequence
We never did put the switch to dim.
I never
thought of it in 8 days eibher. I'll bet you it's
on t he bright-dim circuit, but we never used that
swit ch.
We ' ve never had occassion to ever use t hat
swit ch.
You lmow we always check sequence l ights
bright .
So, that is what that check is f or.
(laughter)
Cooper