John Company

Gemini 7 Technical Debriefing, 1965

NASA-UAP-D021 · page 100 of 222

Page 100 of 222 of NASA-UAP-D021

Text

This text came with the file. It may have mistakes. When the text and the image disagree, the image is right.

90
" orma.n
Yes ..here it is here•••it was 158 hours a.nd 27 minutes when
we got up, a.nd we had a. wall temperature of 64 degrees and
a. pilot ha.tch temperature of 66 degrees. Comparing this
with 144 hours and 5~ minutes, the hatch temperature had
been 84 degrees, so there was a. 20 degrees drop du.ring this
one evening. ~ I attributed this, plus the fact th.at we no­
ticed la.:rge drift rates when we woke up, to the fact that
the water boiler must have been opera.ting during the night.
It was the only time during the flight that we noticed these
large drops in tempera.ture.•. the very cold wall tempera.tures.
We were on double loop, B pumps most of the time. Finally,
went to A pump twice in the flight when people were in the
suits in order to at~ cool.
We went to double A pumps, of
course, when we were powered up.
Lovell
We bad one time when we bad one A pump on.
:Borman
Twice we had it on.
Lovell
Twice, but just one primary pump.
We did not go to two A
pumps.
l3orma.n
No. A pump in the primary loop was on twice to keep cool.
Lovell
Right. The second.a.ry loop A pump was not on.
Borman
Never on except during periods when the platform we.a running.
Lovell
Right.
Borman
Now, as I mentioned before, when we were running both B