Gemini 7 Technical Debriefing, 1965
NASA-UAP-D021 · page 154 of 222
Text
This text came with the file. It may have mistakes. When the text and the image disagree, the image is right.
144 Bormar1 We always had the ACQ off when we were transmitting. The only possible problems that we could have had with this expe=lment was when we lost our ~ape recorder. We could not put some of the data on tape. We had to always take the data over a receiving station. Lovell Or use the recorder. Borman Or use a recorder. Lovell One problem which we did ha.ve a.nd which I was not briefed on was the fact that I inadvertently l eft the gear on one time and it gave a nine second pulse on the main ammeter system. We could not figure out what this glitch was coming in on the Main Bus. Borman This was right after we lost the thrusters. We thought there might have been something in the ACME bias power or something in the in,rerter that was breaking down and putting out a glitch. We called the ground to tell them we found it and they said t hat i t was exactly what the ground had thought it was. Borman Cloud illumination lightning; we got some good lightning shots for them. Day land measurements, we got. Ascension Calibration was done twice.