Gemini 7 Technical Debriefing, 1965
NASA-UAP-D021 · page 16 of 222
Text
This text came with the file. It may have mistakes. When the text and the image disagree, the image is right.
6 2.7 Wind shear Borman Wind shear. I did not notice any. Lovell I did not notice a:ny wind shear either. Borman You could not see any on you attitude gauges either, could you? Lovell No, that is what I mean. Borman The atti tude gauges stayed pegged. Right? Lovell They stayed nulled throughout the entire flight. I was a.ma.zed a t the accuracy with which the RGS was following the IGS program. 2.8 DCS Updates Lovell Ca.me through on schedule. Borman No problem? Lovell No trouble. Borman Have any trouble punching the light ? Lovell After the second upda.te, about 2:23 ,the g 1 s are too ~igh to let you punch off the l ight. So , you have to wait for staging, and then punch the l ight. 2.9 Engine 1 Operation Borman Engine 1 operation, I thought, was norma.l. But I did noti ce a sl ight hint of a POGO a.round a.bout, I would esti mate, two minutes. The slightest, faintest hint. I do not think J im even noticed it.