Gemini 7 Technical Debriefing, 1965
NASA-UAP-D021 · page 171 of 222
Text
This text came with the file. It may have mistakes. When the text and the image disagree, the image is right.
161 Lovell After seeing GT-6 1 s film of our back area, the straps hanging off our spacecraft looked like they were all intertwining in that boom area. It could probably foul up that boom somewhat in future flights. I mean in a future flight if we still had that same problem it mi ght foul up that boom and tear off tha t wire. There is a wire that goes out to the end of that thing. Borman All the experiments we talked about so far were well presented before hand. We knew exact ly what we were going to do, and the only reason we weren't able to uo it was 1) weather, 2) lack of fuel, and 3) in the case of the D-5, the equipment broke down. I think we got a substantial amount of S-5 and S-6 done. As a matter of fact we got everything done that was called up and we got a lot more done just in general pho tography. 11.7 Optical Communications (MSC-4) Borman Optical communications, MSC-4. Okay, acquisition of the ground t arget. I have never been bet ter locked in on White Sands in my l ife than