Gemini 7 Technical Debriefing, 1965
NASA-UAP-D021 · page 189 of 222
Text
This text came with the file. It may have mistakes. When the text and the image disagree, the image is right.
179 Borman Right. Lovell It did complicate the pre-mission planning. Borman Every other experiment I thought was well presented. The experiments division, with Dick Moke helping out did a good job. I WP~ very, very satisfied in other words, with the whole business. 13.0 MISSION CON1ROL Borman Describe and discuss updating on the status of spacecraft and mission. Borman Once a day operation, where we r ead out certain parameters in the spacecraft , reported th~m to the ground, and they have a GO or NO GO for the r-ext area. 13.2 P1A and CLA _llE.dates Borman They were extrem~ly easy to handle. They came up in blocks of about 6 or 9, No problem, since we deci ded to use a rol ling reentry in the event of contingency landing. Lovell We had very little writing t o do. Borman Very little writing. And I might add, based on that reentry, i f I had to do it agai n, that is exactly what I ' d want : a rolling reentry, i f I did not have a l oad in that computer. Because I think it is very difficult to look out the window and observe a horizon during a reentry. At least it was during ours; especially duri ng a night reentry.