John Company

Gemini 7 Technical Debriefing, 1965

NASA-UAP-D021 · page 189 of 222

Page 189 of 222 of NASA-UAP-D021

Text

This text came with the file. It may have mistakes. When the text and the image disagree, the image is right.

179
Borman
Right.
Lovell
It did complicate the pre-mission planning.
Borman
Every other experiment I thought was well presented.
The
experiments division, with Dick Moke helping out did a good
job.
I WP~ very, very satisfied in other words, with the
whole business.
13.0 MISSION CON1ROL
Borman
Describe and discuss updating on the status of spacecraft and
mission.
Borman
Once a day operation, where we r ead out certain parameters in
the spacecraft , reported th~m to the ground, and they have a
GO or NO GO for the r-ext area.
13.2 P1A and CLA _llE.dates
Borman
They were extrem~ly easy to handle.
They came up in blocks
of about 6 or 9,
No problem, since we deci ded to use a
rol ling reentry in the event of contingency landing.
Lovell
We had very little writing t o do.
Borman
Very little writing.
And I might add, based on that reentry,
i f I had to do it agai n, that is exactly what I ' d want : a
rolling reentry, i f I did not have a l oad in that computer.
Because I think it is very difficult to look out the window
and observe a horizon during a reentry.
At least it was
during ours; especially duri ng a night reentry.