Gemini 7 Technical Debriefing, 1965
NASA-UAP-D021 · page 20 of 222
Text
This text came with the file. It may have mistakes. When the text and the image disagree, the image is right.
10 :::action 2 delta Plight did not go out a.nd it was ••• Lovell No, J:ection 1 went on and out again during the £light. It went out at, I think it went out at SECO. Borman That is right. Lovell But 'Section 2 came on and we saw that one £or the next 14 days. 2.20 Acceleration Borman Acceleration during stage 2 was right on the money, right on the program. I read of£, I think i t was about six a.nd a I half g a maximum. We read this off after SECO. 2.21 Fairing Jettison Borman Fairing Jettison, I did not even hear it. I was concentra ting on the horizon, trying to get set for turning around. Jim jettisoned the fairing and punched the Spacecraft SEP. I did not see a.nything or hear a.nything. Lovell I saw debris and heard it and had a definite knowledge that a squib had gone off. There had been an explosion. 3.0 INSERTION 3.1 Post SECO Borman Maneuver controller was easy to reach. I had it out, and there was no problem. It came out and was ready to go. Attitudes and rates, there were none. The thing was as solid a.a a rock as far as I could determine. I was watching