206 our training. We switched in and out of a singl e sui t , wet, or not wet , and got it all completed by one o ' clock. 14.11 Launch simulations • 14.12 Reentry simulations 14.13 Simulated network simulat ions 14.14 Network simulations Borman Launch simula t ions, Reentry simulations , and Simulated Network Si mulations, and Network Simulations, at the Cape down here, f or us, were a total waste of time . We have al ready mentioned this earlier, but because of the fact that the simulator was not playing with the Mcc, r would .not say the l aunch simulations were a t otal waste of time. We did get some launches, but I am afr ai d that the time spent was not profitable .