Gemini 7 Technical Debriefing, 1965
NASA-UAP-D021 · page 42 of 222
Text
This text came with the file. It may have mistakes. When the text and the image disagree, the image is right.
32 inches in diameter at the exit from the water boiler vent. Lovell There were only two problems that we really had. There were the Fuel Cella and the two thrusters. We also had a cold Spacecraft. Borman Yes, that is when we had that water boiler problem. Lovell Before that; the first time we woke up, it was 20 degrees oolder inside. Borma.n Oh yes, I'm sure what had happened du.ri ng the night was that we vented the water boiler, used the water boiler. This is the day when we woke up and had such high rates o.n the S/C. We have all that in the cabin temperature survey. The wall temperature was 20 degrees lower. Lovell It was just freezing in there. 5.0 REIBOFIRE 5.1 TR-2:00 Power Up and Alignment Checklist Borman We had a slightl y different procedure as far as retrofire goes. Powering up for i t took two hours. The power up and alignment checklist was called up from the ground since we had open circuited two stacks. We turned our ma.in batteries on and the squib batteries back on at TR minus two hours. Lovell During the flight they had powered us down on the squib batteries and put in the bus ties about the l ast week of the