Gemini 7 Technical Debriefing, 1965
NASA-UAP-D021 · page 5 of 222
Text
A machine read this text from the scan. When the text and the image disagree, the image is right.
CONFIDENTIAL TABLE OF CONTENTS Paragraph | | Page Number 1.0 | COUNTDOWN | 1.1 | Crew Insertion | 1 1.2 | Communications | 1 1.3 | Crew Participation in Countdown | 1 1.4 | Comfort | 1 1.5 | Environmental Control System | 2 1.6 | Sounds | 2 1.7 | Vibrations | 2 1.8 | Visual | 2 1.9 | Crew Station Controls and Displays | 3 2.0 | POWERED FLIGHT | 2.1 | Lift-Off cues | 3 2.2 | Roll Program | 4 2.3 | Pitch Program | 4 2.4 | Aerodynamics | 5 2.5 | Environmental Control System | 5 2.6 | Maximum g | 5 2.7 | Windshear | 6 2.8 | DCS Updates | 6 2.9 | Engine 1 Operation | 6 2.10 | Engine 2 Status | 7 2.11 | Acceleration g's | 7 2.12 | POGO | 7 2.13 | Guidance Initiation | 7 2.14 | BECO | 8 2.15 | Staging | 8 2.16 | Engine 2 Ignition | 9 2.17 | RGS Initiate | 9 2.18 | GO/NO GO | 9 2.19 | Systems Status | 9 2.20 | Acceleration | 10 2.21 | Fairing Jettison | 10 3.0 | INSERTION | 3.1 | Post-SECO | 10 3.2 | SECO plus 30 seconds | 11 CONFIDENTIAL