John Company

Gemini 7 Technical Debriefing, 1965

NASA-UAP-D021 · page 59 of 222

Page 59 of 222 of NASA-UAP-D021

Text

This text came with the file. It may have mistakes. When the text and the image disagree, the image is right.

49
Borman
We'll have to see.
We don't have readings on that .
Lovell
Okay, because I'm sure we did more than 20 degrees.
:Borman
Then I t hrew the motor valves back open age.in on the thrus­
ters, and that seemed to stop it. So I left them open a
while and finally turned them on again and it stopped, and
it settled out, and it was pretty smooth on the drogue. As
a matter of fact, when we got dow to ma.in chute, it we.a
steady as a rock on the drogue.
Lovell
Yes.
6.7 35K Checklist
Borman
I turned off the RCS motor valves a.nd blipped t he thrusters
to clear the lines between 30,000 feet to 26,000 feet. And
Jim then opened--The 40K ba.rostat worked fine.
6.8 Communicatiol_!!!
Borman
And we gave the reentry status report. I 'm not sure th&t
Houston heard it, but we told them the drogue was all risht
and okay.
6.9 26K Checklist
Borman
Jim, at 26,000 feet you opened the vent air snorkel