Gemini 7 Technical Debriefing, 1965
NASA-UAP-D021 · page 61 of 222
Text
This text came with the file. It may have mistakes. When the text and the image disagree, the image is right.
51 if this oscillation doesn' t s top, I' ll have to punch the main chute on the amber l ight, rather than the altimeter. But the oscil l~tions did stop. 6. 11 Hain Chute Deployment Boman I punched the main chute at 10 , 600 f eet as indicated on the altimeter , and just a millisecond. aft er that, the yellow l i ght came on the 10.6 barostat l ight . The thing deployed immediat ely into a reefed condit ion , and we examined it in the reefed condition and it l ooked very good_ LoveJl Frank thought it was in the reef ed con<lition for 3 months. Borman It seemed like it s tayed reefed for a long time, then it unreefe<l , and I couldn ' t find one gore or one panel that was ripped or frayed or anything. Lovell It was a good chl1te . Borman Perfect chute. 6.12 Post Main Checklist Rorman We accompl ished the post main checklist, anrl then we braced oursel ves very well and went to the single point. of attitune. 6.13 Single Point Rel ease Bormim When we went to the single point attitude it was exactly the same as we had had it at St . Louie--where they' d rigged--they had a test after John and Gus ' s fl ight . They put a test capsul e suspension at St . Louis, and this was