Gemini 7 Technical Debriefing, 1965
NASA-UAP-D021 · page 69 of 222
Text
This text came with the file. It may have mistakes. When the text and the image disagree, the image is right.
59 suit fans, snorkel valve open, and the vent valve open. We a]so opened the repress valve. Electrical: We per formed a simple electrical check. We turned off 3 and 4J l eft 1 anrl 2 on, and watched for the variation in voltage on the main buses. The bus that is fed by land 2 bat teries varied with wave action. Lovell That is right. But 3 and 4 dirl not move from zero. Borman And then you turned off squib batteries land 2 also didn't you? Lovell I left squib battery 3 on. Borman Squib battery 3 was the only one that was on. Lovell Control: We turned off the platform, the computer, the circuit hreakers to the thrusters, and the RCS thrusters. Borman He l eft the comput er in PRELAUNCH for 48 seconds or more, before we turned it off. Aeromedical, no comment. Except blood pressure being a nuisance, anrl perhaps even a hindrance when we were trying to go around the cockpit with the switches and you had to ho 1d one arm stil1. 7.5 Spacecraft Status Boman RCS fumes: When you open the snorkel at around 26,000 feet you get a good load of them. Lovell I am not sure what kind of fumes they were. They were not familiar to me. I have smelled the results of fuel in the