John Company

Gemini 7 Technical Debriefing, 1965

NASA-UAP-D021 · page 69 of 222

Page 69 of 222 of NASA-UAP-D021

Text

This text came with the file. It may have mistakes. When the text and the image disagree, the image is right.

59
suit fans, snorkel valve open, and the vent valve open.
We a]so opened the repress valve. Electrical: We per­
formed a simple electrical check.
We turned off 3 and 4J
l eft 1 anrl 2 on, and watched for the variation in voltage
on the main buses. The bus that is fed by land 2 bat­
teries varied with wave action.
Lovell
That is right. But 3 and 4 dirl not move from zero.
Borman
And then you turned off squib batteries land 2 also didn't
you?
Lovell
I left squib battery 3 on.
Borman
Squib battery 3 was the only one that was on.
Lovell
Control:
We turned off the platform, the computer,
the circuit hreakers to the thrusters, and the RCS
thrusters.
Borman
He l eft the comput er in PRELAUNCH for 48 seconds or more,
before we turned it off. Aeromedical, no comment.
Except
blood pressure being a nuisance, anrl perhaps even a
hindrance when we were trying to go around the cockpit
with the switches and you had to ho 1d one arm stil1.
7.5 Spacecraft Status
Boman
RCS fumes:
When you open the snorkel at around 26,000
feet you get a good load of them.
Lovell
I am not sure what kind of fumes they were.
They were not
familiar to me.
I have smelled the results of fuel in the