Gemini 7 Technical Debriefing, 1965
NASA-UAP-D021 · page 73 of 222
Text
This text came with the file. It may have mistakes. When the text and the image disagree, the image is right.
Borman Okay. On :postland.1nc we just sat there. Lovell Wel l, we went through the check-off list. That took al1 the time. I saw the swimmers, checked the electrical system, that they wanted us to do for postlanding. By that time the swimmer had the collar up. I couJrl see the collar going up, and then he got the jacket on . Borman We ha.d good commun i cation with the swir:uner through thA.t jack. Lovell Excellent communicati ons with the swimmer. 7. 7 Comfort Borman It gets pretty warm in that sp~cecraft. I would hate tn spend any great deal of time in there without any F.C:i . Lovell I can speak as an authority on that. 7.8 Recovery Poree Personnel Borman We covered communications, it was excellent. Flotation co1Ja.r was fine, wor ked good. 7,9 F.gress Borman Egress was normal, just as we practiced in Galveston Day several times. These helicopters did a fine ~oh. I think someone said it was about 23 minutes after we landed that we were on our way back. 7.10 Survival Gear Bom an Even the underarm life pr eservers inflated this time. Wonder of wonders. No prob1em .