Gemini 7 Technical Debriefing, 1965
NASA-UAP-D021 · page 96 of 222
Text
This text came with the file. It may have mistakes. When the text and the image disagree, the image is right.
86 the suit we r&n. with it in a 45 degree position. When both people were m the suits, we ran it in the 45 degree posi tion. Lovell I'd like to make one comment· on the C&bin Inlet Valve, I think a. future procedure woul d be to either open the visor or unzip the hood prior to using the snorkel va.lve, so you do not get this concentrated ambient flow into the suit in a small concentrated area. Okay. Primary o2 System Monitoring. Borme.n Prima:ry o System Monitoring was no problem. The cryogen 2 ics bottle for ECS o2 orygen did vent•.. I think i t was a.bout the 8th d~ it started venting. Performance of the cryogenics bottles have been outstanding. The first one, ECS o2, started venting tod~. And we were still adding heat to the other two bottl es. Let's see, this was Sunday morning so that woul d have been the 8th day that i t started ventmg. The quantity measuring system worked fine. The flow rates were adequ&te . I just ca;nnot emphasize enough the desirabil ity of going without suits. The pressure a.nd temperature remained just nominal. We had dome plots &boa.rd the spacecraft, and we checked them out. We had to use the auto heater on the ~S o2 bottle perhaps, the first two days or so and then we were able to turn the heater off complete