Mission Report, Strait of Hormuz, September 2020
DOW-UAP-D062 · page 5 of 9
Text
This text came with the file. It may have mistakes. When the text and the image disagree, the image is right.
• Primary Sensor: ANDAS4 • Sensors Available: AH\GMESH • Tasking Type: PLANNED • Tasking or Request Number (JTAR#, AEM#, PRI#, or TIC# : • BE Number (ifNTISR): • Tasked Start Point: 40RCQ3@}~1.4a! • Activity Description: ISR • FMV or Image File Name (ifNTISR): GENTEXTIISR • Geotext: (3il i2 JI 1.4a !COORDINATED NAVCENT 24 HOURS PRIOR TO TAKE OFF. PRECOORD WAS SATISFACTORY. AT 03182, 1.4a ARRNED ON STATION ISO NAVCENT FOR OPERATIC~ 1.4a ~O CH.AR1CTERIZE IRIN\IRGCN VESSELS, UAS ACTIVITY, ACTIVITY OUTSIDE OF PORTS, AND TO E~TABLISH PATTERN OF LIFE. FROM 03182 TO 18292,~CONDUCTED SCANS IAW Tl-Ir TARGET DECK IN THE ARABIAN GULF (AG). AT 0930Z~OBSERVED AN IR-!t-5 LAUNCHER IVO 40RCPo:rn~oN ABU MUSA ISLAND. AT 1321Z,I 1.4a ;IBS;ERVED 2X POSSIBLE HOUDONG WPTG IVO (39RXL6~~ DOCKED PIERSI E. AT 04082,~RECEIVED A GUARD CALL. SEE GUARD CALL LINE 1. AT 04212,0]i] C~IVED A GUARD CALL. SEE GUARD CALL LINE 2. AT l 141Z~RECEIVED A GUAR.Ip CALL. SEE GUARD CALL LINE 3. AT 17322,~OBSERVED NOTEWORTHY ACTMTY. SEEIOBS LINE 1. AT 18292,~AS CLEAR.ED OFF TASKING AND RETURNED TO BASE (RTB) JSR ASSET UTILIZATION • Supported Unit: NAVCENT • Supported Operation: OPERATIOl'i 1.4a • Precoord Time: 24 HOURS • Precoord Effectiveness: SATISFACTORY WEATHER • Weather: (U) WEATHER WAS NOT A FACTOR EFFECTIVENESS • Tasker: • Intel Gap Filled?: No • Gentext: OffStation USCENTCOM MOR 26-0019 Approved for Release to MRO] 01 /26/26 005