John Company

Preliminary Gemini 4 Crew Debriefing, Part I, 1965

NASA-UAP-D016 · page 100 of 340

Page 100 of 340 of NASA-UAP-D016

Text

This text came with the file. It may have mistakes. When the text and the image disagree, the image is right.

92
I
McDivitt
White
McDivitt
White
McDivitt
cor ◄ FIE>f~IAL
everything out without m~ch problem at all.
think it took •ls longer actually to p1lt it
all together..
That ' s right .
It did.
We started going
through the checklist here and putting the
things on and W'3 started getting more and more
rushed.
We were supposed to star.t the E[,rress
Preparation Checklist at abo:it 1:44.
We
probsbly sta::-ted it at about 1:35 or so.
We
started it about 10 minutes early, roughly ,
maybe five to 10 min1tes early.
We were
supposed to be ready to start the depressu r.a7,a­
tion at 2: 30 over Carnarvvn .
I think I could h.3,ve gone through ari:i l1ook2d
ev8.rything all up , but I felt that we should
go -:hc:-ough fairly close to the p~ocedure w1; had
set up on the checklist.
That
I s r igh t .
I think this slowed us down .
Well, we set tht, procedure up so tha~ when we
finished wlth it, it would be right.
I think
this helter- sk8lter thing that we were being
forced into was for the birds.
So an Ne g0t
farther al:mg, it beca;n,~ .:i.ppar,mt to nt, that
eot~Ftl:>ENll-AL