John Company

Preliminary Gemini 4 Crew Debriefing, Part I, 1965

NASA-UAP-D016 · page 193 of 340

Page 193 of 340 of NASA-UAP-D016

Text

This text came with the file. It may have mistakes. When the text and the image disagree, the image is right.

185
McDivitt
that first phase of mission sequen~es that I
first mentioned.
I think the next thing we
should do :;s go through the interim o~bits, about
50 or 55 , or ho~ever many there were, where we set
abo~.1t to save up enough fuel to do soJ1ething con­
structive, to check on our orbit to see what it
was, to see how we were d,3caying, what our life­
time expecta':lcy would be, and perform the exper­
iments that we'd initial ly set out to do on ~ur
flight plan. Although, it's not going to be of
much use to go through it in a chronological
ord.er, I suppose that is probably the best way.
As I just finished saying, we're not going to
get a.'1 awful lot 0 1.1t of going thro·.1gh the flight
plan sequentially, but we'll do it quickly and
then we ' ll co:ne back and discuss each experiment
o~ operation, check as entity in itself, a"ld
we'll dis8uss the systems as an entity, too .
We ' ll do this, generally, in elapsed time .
Going back to the EJVA for J.1st one moment . I'd
like to say that the use of the ma'111al heaters on
ECS o bottle was abo'.lt two f ive-min1te periods
2
separated by about 10 min:.ites.
We really
did~1.' t need an awful lot of ma.ni.lal heater when wa