Preliminary Gemini 4 Crew Debriefing, Part I, 1965
NASA-UAP-D016 · page 233 of 340
Text
This text came with the file. It may have mistakes. When the text and the image disagree, the image is right.
225 McDivitt probably one of the weakest points in our flight planning-- trying to get times correlated . This correlation between one time and the other time is hard to handle. We were getting start times in GMT. We sai d that we wanted these start times in GMT because this i s the only official time that we had. The elapsed times were just for planning. We only kept them to the nearest two or three minutes . I started my Omega watch on elapsed time at take-off, and I just let it run through the whole flight. I never set it. I never checked elapsed time or anything. It could have been off two or three minutes , but I was doing the flight plan to the nearest iO minutes off the book here. When we got retrofire times and when we got start t imes for things, we got them in GMT . It made it awfully confusing in the flight plan by switching back and forth, Fortunately, we got off at 15:15 which is better than getting off at 12:36 or something like that. On the Apollo mission we 've got a better set of clocks . We're going to have Mission Time and Phase Time , so whenever you start a new phase CONFtDENlJ.M