John Company

Preliminary Gemini 4 Crew Debriefing, Part I, 1965

NASA-UAP-D016 · page 243 of 340

Page 243 of 340 of NASA-UAP-D016

Text

This text came with the file. It may have mistakes. When the text and the image disagree, the image is right.

White
McDivitt
White
McDivitt
White
McDivitt
White
we eliminated the last two steps in it.
We did
the zero bank angle and the pitch up and down.
We did the zero pitch angle and the roll left and
right .
We did the bank to one side and the pitch
up and down ,and we did the pitch up and the bank
on both sides .
We didn ' t do the pitch down and
the bank on both sides ,and we didn't do the roll
left and the pitch up and down.
We were running
late and at that time I didn ' t know how we were
doing on electrical' power and everything,so I
elected not to do the last two portions of the
check.
We had it pretty well ironed out , anyhow.
Yes .
Surprisingly broad bands , too.
The scanners seemed to be working perfectly.
The
attitude thruster check was just as it should have
been.
We powered down the platform and turned off
the MSC Experiment No . 1 about two minutes late.
We powered down at 13:27.
Okay, seven minutes late.
We never did take any
16 mm photos of the plumes .
Before you went to sleep on t his one.
<iONFIDENTIA~