Preliminary Gemini 4 Crew Debriefing, Part I, 1965
NASA-UAP-D016 · page 243 of 340
Text
This text came with the file. It may have mistakes. When the text and the image disagree, the image is right.
White McDivitt White McDivitt White McDivitt White we eliminated the last two steps in it. We did the zero bank angle and the pitch up and down. We did the zero pitch angle and the roll left and right . We did the bank to one side and the pitch up and down ,and we did the pitch up and the bank on both sides . We didn ' t do the pitch down and the bank on both sides ,and we didn't do the roll left and the pitch up and down. We were running late and at that time I didn ' t know how we were doing on electrical' power and everything,so I elected not to do the last two portions of the check. We had it pretty well ironed out , anyhow. Yes . Surprisingly broad bands , too. The scanners seemed to be working perfectly. The attitude thruster check was just as it should have been. We powered down the platform and turned off the MSC Experiment No . 1 about two minutes late. We powered down at 13:27. Okay, seven minutes late. We never did take any 16 mm photos of the plumes . Before you went to sleep on t his one. <iONFIDENTIA~