Preliminary Gemini 4 Crew Debriefing, Part I, 1965
NASA-UAP-D016 · page 252 of 340
Text
This text came with the file. It may have mistakes. When the text and the image disagree, the image is right.
244 it and it comes down and then just for the hell of it you pull it up again to see if it's going to come up. I don't think we should have ever turned off the computer. Unfortunate ly, I didn' t have all the infonnation at my fingertips that I needed to really make a de cision on it. When we got to the next station, which was Hawaii, I asked them how we were doing on electrical power. They sai d that we were 160 amp-hours ahead of the curve. We had a 200 amp-hour cushion, so that meant that we had a 360 amp-hour pad on our flight pl an. In the meantime, I had checked to see what the computer- ON, IGS Power Supply-ON took. It took 5. 6 amp-hours to power this thing. We were at 76 hours on a 96-hour mission and we had about 20 hours to go. Twenty times 5.6 is a little over 100. So, if we had used up these 100 amp-hours , we'd still finish up with a better electrical pad than we started out with, or than we expected when we started out. So, I sort of feel that we needlessly threw the computer down the drain. After we got the