John Company

Preliminary Gemini 4 Crew Debriefing, Part I, 1965

NASA-UAP-D016 · page 30 of 340

Page 30 of 340 of NASA-UAP-D016

Text

This text came with the file. It may have mistakes. When the text and the image disagree, the image is right.

22
eot~FIDE~~"f1At
pick out windshear • on them.
How about you, Ed?
White
No.
McDivitt
Did you see any attitudes?
White
No .
McDivitt
No big divergences from windshear .
2.8
DC~ Updates
White
We got both of our ros updates right on time-­
H'45
a.nd 2: 25,
McDivitt
No comment.
Ed is in charge of ros updates.
White
I 'm the button pusher.
I do everything about
pushing the buttons.
McDivitt
I can do this with this little stick.
White
You can do it unless I have my knee over it.
2. 9 Engin,®. 1 Operation
McDivitt
They operated the way they were supposed to as
far as I could tell .
The tank pressures stayed
up fi~ on both
Engine 1 and Engine 2.
There
was never any doubt in my mind that they were
going to stay up there.
There weren't any of
those things like we saw in those simulations
where they came on down pretty low on the gages
when they were supposed to be at 18 or 15. There
wasn't anything like that .
They just stayed on
up there.
€0t'1Flf7ENf 1Al