Preliminary Gemini 4 Crew Debriefing, Part II, 1965
NASA-UAP-D017 · page 69 of 290
Text
This text came with the file. It may have mistakes. When the text and the image disagree, the image is right.
that the four of us got it pretty well squared away. Then just before launch we found out down at the Cape that because they had gotten those switches in the wrong position we pumped 32 pounds of water out of the adapter, used up all the pressurant for the water system, and pumped all the water into the lithium hydroxide canj.,3ter. If it hadn't been for one last minute check in the data, we would have lost the lithium hydrox ide canister full of water and nothing to drink with. So we would have had about an hour flight, if we had gone that long. I think that before we fly another flight we ought to have all the people at McDonnell and NASA, who are ·respons-ible for this thing get it squared away and figure out just where the heck they want these switch posi tions.and get them there. If there are a lot of switch positions on that panel that aren't useful anymore, we should just go ahead and block them off. We decided between the four of us that there were--I don't even know what they call those switches- White Condensate Valve and Water Valve. ..