Preliminary Gemini 4 Crew Debriefing, Part II, 1965
NASA-UAP-D017 · page 70 of 290
Text
This text came with the file. It may have mistakes. When the text and the image disagree, the image is right.
McDivitt White McDivitt White McDivitt --and the Water Valve should be put in NORMAL NORMAL.and left there. That was ~xa.ctly what we did and we knew how to work the waste management valve. We didn't screw it up, but I ' m not sure that if with a little trying, we couldn't have . We never had to use the Evaporator Fill Mode. The Flush Mode,or the waste ·management portion of the thing,had a couple of different positions . In the normal OVERBOARD position and in using the Preheat and Flush switch over on the side, we managed to dump a large number of urine dumps through this. We dumped both our launch- day urine bags which were full. I probably urinated eight or ten times and you probably about five or six t i mes. About five times . About five times . So we had a lot of dumps through this thing. At 92 hours it stopped work ing. Ed had filled up the bellows pretty well just before this. I was the man in charge of dumping urines, it seemed like . The Urine Dumper!!! I was the only one who could reach the knobs and switches . It ~ nerally went down in spurts. ~8-Mf'IDt=P,.ffIrA L