John Company

Gemini 4 Experiment Debriefing, 1967

NASA-UAP-D018 · page 26 of 224

Page 26 of 224 of NASA-UAP-D018

Text

This text came with the file. It may have mistakes. When the text and the image disagree, the image is right.

M-913-65-03
TABLE IV
GT-4 CONSUMABLE LOADINGS
ITEM
QUANTITY
REMARKS
Batteries
OAMS Propel I ants
Odixizer
Fuel
Oxygen
Primary
Secondary
Lithium Hydroxide
Food
Drinking Water
Spacecraft
Adapter
RCS Propellants
O xidizer
Fuel
703 I bs. based
on a 2400 A-h
246 lbs
164 lbs
52 lbs
13 lbs
97 lbs
lb lbs
14 lbs
61 lbs
40. 4 lbs
3l.61bs
Each battery has a
400 A-h capacity
Egress bottle are also
carried if ejection is
required.
LANDING SEQUENCE
At the end of the mission, the parachute
landing sequence shown in Figure 21 will
be employed. One item that should be
mentioned in this regard is that should the
84-foot main parachute fail to open, the
crew can abandon the spacecraft by eject­
ing and using their personal parachutes to
effect a safe water landing. The latter
sequence would also be employed should
the spacecraft come in overland instead of
the intended water landing.
FIG. 21
GEMINI PARACHUTE LANDING SEQUENCE
50,000 FEET
-
HIGH ALTITUDE
DROGUE CHUTE
DEPLOYED
\
21 , 000 FEET
-
Oft:N CABIN VfNT
t
VALVE
10, 600 FEET
-
PILOT PARA.CHUTE
DEPLOYED
9,600 FEET
-
It A It SECTION
SEPARAT ION
9,000 FEET
-
MAINCHUTE
DEPLOYMENT
!'
6,700 FEET
-
TWO-POINT
SUSPENSION
1,500 FEET
-
CABIN WA.Tflt
SEAL CLOSED
1_
SEA LEVEL
-
TOUCHDOWN
~~- JffilSONCHUTf
~
­
5/ 24/65
Page 16