Gemini 5 Technical Debriefing, Part I, 1965
NASA-UAP-D019 · page 139 of 223
Text
This text came with the file. It may have mistakes. When the text and the image disagree, the image is right.
134 Conrad On S-8, D-13 we completed all tests although we didn' t see the targets several times. On S- 1 we completed it. S-5 and S-6 we'd taken three maga zines for a total of 210+ pictures . S-7 we had 23 pictures or 8 groups that they had ~anted plus we had taken cal card picture. The M-1 broke at 4 days and some odd hours, and I don' t know the exact time. M-3 didn't make any difference. MSC-1 we did on day one , three, and four. Apollo-we got Landmarks 207, 8, 121 and 13. We'd done 4 cabin lighting surveys. The humidity sensor we read at least once a day, and the 16mm film we had one and a quarter magazines shot up which is general stuff. That was what we had completed in 5 days. Then from there on, we went through this big drill of sending up of all kinds of experiments but don't expend any fuel on them. An so we were pretty well restricted to S-5, S-6, and S-7 type phJtographs which was about all we got. Cooper Catch as catch can. Conrad We marked down all this other stuff. W1~ did catch a D-4/D-7 occasionally if it was the ri1sht sort of thing-if we were sort of pointed in the right