Gemini 5 Technical Debriefing, Part I, 1965
NASA-UAP-D019 · page 145 of 223
Text
This text came with the file. It may have mistakes. When the text and the image disagree, the image is right.
140 Cooper Conrad Cooper Conrad ~ NFl0ENTIAL and we got them back again and lost it 3 minutes later at 07 days 16 hours and 30 minufos . Then we did a MSC- 1. I have a note here 7 days and 20 minut(~S was that large storm where we located the depre:3sion on it. Take a look at it , and see just where :Lt was , and weather breaking off from it. And then when they came up with their :1ext ground t est whi ch- Had two S-7 eXPeriments . . ..which I think we could have done without and that ' s when they had us warm up the solenoids for ten minutes. The thing that got to us was that we had turned-- They had us shut off the Propellant Valve and what we should have done was dumped the Propellant by rotating through all control posi tions on the handle , but what they had us do was go to the full yaw left position and dumped the whole load of manifold pr opellants out through the the mal functioning left yaw thrusters and man did .that couple up into a couple of beautiful rates, and we were doing it at night, and we didn ' t realize until it was too l ate and all of a sudden there were the