Gemini 5 Technical Debriefing, Part I, 1965
NASA-UAP-D019 · page 165 of 223
Text
This text came with the file. It may have mistakes. When the text and the image disagree, the image is right.
160 Cooper So they wanted to keep the platform warmed up also . So we went for some approximately 20 hours with the platform warm-running-up. Conrad In drifting flight . Cooper In drifting flight. So what we did- we caged the platform, brought it up to cage and the~ we just went to orbit rate. Left it in orbit rate and we caged it at a time when were just guessing pretty close to o7o1o and then went to orbit rate. Some 20 l'..ours later drifting all around,- tumbling all over the sky,-·all over t he places- Conrad It was amazing how close the pl atform 1,,as. Cooper The platform was almost right on what cur attitude was after that many hours of orbital rate errors and drift etc. etc. added in to there and it still was a good relative attitude indicator I thought it was really good. Conrad In all three a.xis it stayed on. I was pretty surprised. Cooper I really thought that was quite good. That platform really behaved well and it really took a l ot of abuse. Dif ferent times we powered it up- in drift- did all kinds of things. You couldn't have mistreated it more if you tried. Alining the platform very straightforward. We alined it in BEF. First of all, we went right to